CO129-157 - Sir MacDonnell Acting Governor Sir Kennedy - 1872 [4-5] — Page 252

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

may

be the state

the employer's views

like

word?

of

the

market, or

of the value of

labour and materials used,

if

this rule is arbitrarily adhered to.

the contractor being suspicious on the

part

of

...

is apprehension

...

250

the part of

the

Chinese that the Government requires

them to submit plans drawn by European Architect before

commencing

a)

Chinese House-

to build. At present Chinese

desiring

to build a verandah

similar to others in the same locality

or

the Chinese to save themselves

high time that

are called upon to furnish

from the effects of the system.

A

40. It seems

the Survey Department should be

provided with its

Schedule to

be altered

from

time to time according to the fluctuations of the market. This

Schedule should be publicly and recognized by the Government and those employed by the Government.

41. The next point calling for

attention is

separate plans drawn by a European

Architect. This

and is

doubly

to erect a

cook house,

seems unnecessarily hard,

when they

are

absent

a

simple building, like a

Their

own

property

42. Much time and labor would

be saved

if

the dimensions of each

Public Building

were recorded in the

Edit History

2026-05-20 16:56:40 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
may be the state the employer's views like word? of the market, or of the value of labour and materials used, if this rule is arbitrarily adhered to. the contractor being suspicious on the part of ... is apprehension ... 250 the part of the Chinese that the Government requires them to submit plans drawn by European Architect before commencing a) Chinese House- to build. At present Chinese desiring to build a verandah similar to others in the same locality or the Chinese to save themselves high time that are called upon to furnish from the effects of the system. A 40. It seems the Survey Department should be provided with its Schedule to be altered from time to time according to the fluctuations of the market. This Schedule should be publicly and recognized by the Government and those employed by the Government. 41. The next point calling for attention is separate plans drawn by a European Architect. This and is doubly to erect a cook house, seems unnecessarily hard, when they are absent a simple building, like a Their own property 42. Much time and labor would be saved if the dimensions of each Public Building were recorded in the
Baseline (Original)
may be the state the employ's views ike word? of the market, or of the value of dow and materials used, dare this rule is arbitrarily adhered to. the cont! being schaning on the part of ที่ isapprehension 3x 250 the part of the Chinese that the Government requires them to submit plans drawn by European Architect before Conn a) encing Chinese House- to build. At present Chines holdow desiring to build a verandah. similar to others in the same law or the Chinese to save themselves high time that locality are called upon to fumuish from the effects of the system. A 40. It seems the Survey Department should be provided with its be altered from wow Ichedule to time to time according to the fluctuations of the market. This Annon Schedule should be publicly and recognized by the Government and those employed by the Government. 41. The next point calling for The correcting attention is 1 separate plans drawn by a Emopean Architect. This and is doubly to erect a cook house, semu unnecessarily hard, when they are abent a - simple building, like a Their aon property 42. Much time and labor would the dimensions of each be saved if Public Building werd recorded in the
2026-05-20 16:56:40 · Baseline
View content

may

be the state

the employ's views

ike

word?

of

the

market, or

of the value of

dow and materials used,

dare

this rule is arbitrarily adhered to.

the cont! being schaning on the

part

of

ที่

isapprehension

3x

250

the part of

the

Chinese that the Government requires

them to submit plans drawn by European Architect before

Conn

a)

encing

Chinese House-

to build. At present Chines

holdow desiring

to build a verandah.

similar to others in the same law or

the Chinese to save themselves

high time that

locality

are called upon to fumuish

from the effects of the system.

A

40. It seems

the Survey Department should be

provided with its

be altered

from

wow

Ichedule to

time to time according to the fluctuations of the market. This

Annon

Schedule should be publicly and recognized by the Government and those employed by the Government.

41. The next point calling for

The

correcting

attention is

1

separate plans drawn by a Emopean

Architect. This

and is

doubly

to erect a

cook house,

semu unnecessarily hard,

when they

are

abent

a

- simple building, like a

Their

aon

property

42. Much time and labor would

the dimensions of each

be saved

if

Public Building

werd recorded in the

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.